Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Video: Creation of a new period

 

01 - Master Data - Periods.mkv

Creation of a new period

After first intallation: With a first installation the Pillar 2 Module is not visible immediately. The information for the Pillar 2 Module is implemented in the Questionnaire of the Default Period “---”. To activate the BEPS Module, it is necessary to create a new period that contains this information.

After Update: The Entity Data Collection is not updated for existing periods, but the information is stored in the “---” Default Periode. To use the updated Entity Data Collection it is necessary, that you create a new period that contains this information.

Creation of a new period in the Expert mode:

  • Open the Overview Periods Dialogue in the Master Data

  • Use the button “Create (Expert)” to see the Detail view Period (see screenshot below)

  • A name and the end of period have to be specified

  • Any prior period can be used (used for information from the previous finance year)

  • Any related period can be chosen (Important for true ups)

  • Any Master data / Tax calculation period can be chosen (period of which the master data and tax calculation is taken. You can transport also the values from the tax calculation if you check the respective box and the milestone status of the income tax period with the respective box)

  • “Questionnaire Copy based on…” needs to be the default period! The information from the default period is than transferred to the new period.

    • You can check the version of existing periods in the section Questionnaire Administration. Please read the information about the Questionnaire Administration.

  • You can deactivate modules by activating the checkboxes on the right (e.g. without Country-by-Country module)

image-20240711-112559.png
  • No labels