Multiple Snapshots
Why does the Calculation result in multiple Snapshots?
There are more possibilities why multiple Snapshots are created:There is no Pillar 2 Reporting Dimension Type installed. For more information on this, please see the section on “First steps after an Update”
If you press “Save” for more than one time (e.g. during the calculation of the snapshot) several snapshots are created. If the calculation is already processing, please don’t press “Save” again. The calculation is processing, if you see the following symbol in your tab:
Calculation shows only zeros
Why does the calculations show only zeros, even if values are imported / manually written?
There are more possible solutions why the calculations show only zeros:The entity master data in the section Pillar 2 contains the information that “the entity is not a Constituent Entity for Pillar 2 purposes” - AMAE00 is active for some or all companies.
The entity master data in the section Pillar 2 contains the information that “the entity is an excluded company” - a Status between AMAE20 and AMAE26 is active for some or all companies.
Recast Amount is zero
Why is the Recast Amount zero?
If the Tax Rate is imported from the GTC (and not from a csv) the calculation of the Recast amount fails. This will be fixed with the next update, the calculation of the recast amount will then be part of the CE-Calculation
Calculation is empty
Why is the calculation completely empty?
The Snapshot is not properly selected. This happens for example if you change the period. The problem is solved, if you change to another Snapshot and then change back to the former Snapshot. The Snapshot is then properly selected. This will be fixed with the next update.